Construction  —  05

One contract, one point of responsibility.

Turnkey means you deal with us and we deal with everyone else. Design, approvals, construction, finishes and handover under a single agreement, priced up front, with one party accountable when something goes wrong.

How it works

The process, step by step.

01

Brief

What you want built, where, to what standard, and by when.

02

Feasibility

Plot, regulations, services and budget checked together. If the three do not meet, we say so before you spend on design.

03

Design

Full design developed and signed off. Under a turnkey contract the price follows the design, so the design is fixed first.

04

Fixed proposal

One price covering design, approvals, construction and finishes, with the specification attached to it.

05

Single contract

One agreement, one party accountable. You will not be arbitrating between an architect and a contractor when something goes wrong.

06

Construction

Built and managed by us, reported against the programme.

07

Handover

A finished building, documentation, and a defect period during which we come back.

What helps us quote

  • Plot location and size
  • Building type and use
  • Required area
  • Level of finish
  • Target completion date
  • Budget range
  • Whether design already exists

Request a turnkey proposal

Tell us the plot, the building and the date you need it.