Construction  —  01

Houses and apartments, built to the drawings.

Building a home is where most budgets slip and most timelines break. We take the drawings — ours or someone else’s — and turn them into a costed programme, then run the work against it.

How it works

The process, step by step.

01

Consultation

What is being built, where, and to whose drawings.

02

Site assessment

Access for machinery and deliveries, ground conditions, water and power. These decide the sequence more than the design does.

03

Programme

Trades booked in order, with the weather-dependent work placed where the season allows it.

04

Cost plan

Priced by stage: substructure, frame, envelope, services, finishes. So you can see what each part costs before it starts.

05

Structure & envelope

Foundations, frame, roof and openings. The stage where corrections are still cheap.

06

Services & finishes

Plumbing and electrical first fix, then plaster, joinery and final fittings.

07

Handover

Snagging list worked through, completion certificate, and the warranties and drawings you will need when something needs fixing in five years.

What helps us quote

  • Plot location
  • Drawings, if you have them
  • Built-up area
  • Number of floors
  • Level of finish expected
  • Target start date
  • Budget range

Request a quotation

Send the drawings and the plot location for a costed estimate.