Offices, retail and institutional premises, delivered on a date.

A shop that opens late loses a season. An office handed over late costs rent on two buildings. Commercial construction is less about craft and more about sequence, and that is how we plan it.

How it works

The process, step by step.

01

Consultation

Use, floor area, and the date the premises has to be trading.

02

Constraints survey

Existing structure or bare plot, incoming services, delivery access and permitted working hours. In an occupied building the last one governs everything.

03

Critical path

The sequence agreed before work starts, with the items that cannot slip identified and dated.

04

Package pricing

Priced by trade package, with provisional sums marked as provisional rather than buried in a total.

05

Fit-out

Built in the agreed sequence, with progress measured against the programme each week.

06

Compliance & testing

Fire, electrical and access requirements tested and certified. This is the paperwork that decides whether you can legally open.

07

Handover

Completion, operation and maintenance documents, and a defect period.

What helps us quote

  • Type of premises
  • Floor area
  • Location
  • Drawings or a fit-out brief
  • Required completion date
  • Operating constraints
  • Budget range

Request a quotation

Tell us the premises, the area and the date it must open.